Noverix - data centre campus, built on existing infrastructure

Hyperscale data centre campus

Built on existing infrastructure, positioned for rapid scale.

Shareholders

The project is wholly owned by M.T. Abraham Group, an international industrial investment group with more than 20 years of experience in acquiring, redeveloping and operating complex industrial assets across aluminium, power generation, infrastructure and commodities. Unlike a greenfield developer, NOVERIX benefits from an owner that already controls and operates the underlying industrial infrastructure, providing direct operational oversight, faster decision-making and reduced project execution risk.

Built for Hyperscale

  • 1,500,000 m²

    Total land area of the facility.

  • 450,000 m²

    Land available across three major development areas.

  • 50-200 MW+

    Expansion pathway.

Target Customers

  • AI Infrastructure

    • Hyperscale AI clusters
    • GPU training campuses
    • Sovereign AI
  • Cloud Providers

    • Public cloud expansion
    • Regional cloud regions
    • Disaster recovery
  • Colocation

    • Wholesale colocation
    • Build-to-suit campuses
    • Enterprise hosting
  • High Performance Computing

    • Research
    • Defence
    • Engineering simulation
    • Financial computing

Strategic Positioning

NOVERIX consolidates the infrastructure that typically represents the greatest challenge in hyperscale development: high-voltage power, cooling water, fibre connectivity, development-ready land and logistics. Bringing these critical assets together within one operational campus materially reduces project complexity, development timelines and execution risk.

  • Power
    Infrastructure

  • Fibre &
    Data

  • Water &
    Cooling

  • Road &
    Logistics

Power Infrastructure

NOVERIX is built on a site that has operated at a sustained load of approximately 220 MW for years - a flat, round-the-clock industrial draw closely comparable to a large data centre campus.

Reliable, high-capacity power infrastructure is fundamental to large-scale data centre operations. NOVERIX benefits from established high-voltage infrastructure already available on-site, providing a strong foundation for phased and scalable development.

Grid and substation capacity and phasing

  • Two independent 220 kV transmission lines, each rated at 590 MVA.
  • Dedicated high-voltage substation, with the two connections terminating on separate busbar sections.
  • Two transformers supply the internal distribution network.

The power architecture is planned around an N+1 redundancy principle, with additional transformer capacity introduced for each development phase to support resilience and operational continuity.

  1. National 220 kV grid
  2. High voltage substation
  3. 10 kV internal distribution network
  4. Data Centre Load

Cooling

The site benefits from established water infrastructure, with direct access to river and groundwater resources and secured water permits - supporting large-scale cooling requirements while established utility infrastructure reduces construction complexity.

Connectivity

NOVERIX connects to major European interconnection hubs over established regional fibre infrastructure. Measured round-trip times to key hubs confirm strong performance from the campus's regional connection point.

Round-trip times (RTT) from Zagreb to major European interconnection hubs:

  • Frankfurt 17-20 ms
  • Milan 19-30 ms
  • Amsterdam 23-26 ms
  • London 28-36 ms

Mostar-Zagreb measures at 12 ms over the existing business connection at the site; dedicated connection is expected to improve on this figure.

Additional route diversity is achievable through a short, well-defined fibre extension, offering further resilience beyond the campus's existing connectivity.

Regional fibre map: Mostar linked to Split and Zagreb, with onward routes from Zagreb to Frankfurt, Vienna, Budapest and Milan

Location

Located at the crossroads of Central and Southeast Europe, NOVERIX provides a strategic gateway to major European digital and economic hubs.

The campus is positioned within reach of key regional gateways including Zagreb and Belgrade, with onward connectivity towards Frankfurt, Milan, Amsterdam and London, placing major Central and Western European markets within the wider connectivity ecosystem.

Its location combines proximity to the European Union with the space, power availability and infrastructure required for large-scale data centre development.

For hyperscale and AI infrastructure operators, NOVERIX offers a compelling combination: a development-ready industrial platform at scale, positioned to serve European workloads while remaining connected to the continent’s principal digital corridors.

Map of Europe positioning Mostar relative to Zagreb, Belgrade, Milan, Frankfurt, Amsterdam and London

Security & Resilience

Secure by design. Built for continuity.

NOVERIX is conceived as a secure, resilient hyperscale campus designed to support the demanding operational requirements of AI, cloud and mission-critical digital infrastructure.

Located within a controlled industrial environment, the campus benefits from the ability to establish dedicated security perimeters, controlled access zones and layered physical protection across individual development plots.

Resilience is embedded in the campus concept. Existing high-voltage infrastructure, multiple transmission connections, an on-site substation, scalable utility infrastructure and fibre connectivity provide the foundation for a robust architecture designed around operational continuity and future redundancy.

The scale of the site enables critical infrastructure to be physically separated and independently configured, allowing operators to implement security, power, cooling and connectivity architectures according to their own technical and operational standards.

From physical security and infrastructure resilience to operational continuity, NOVERIX provides the foundation for infrastructure designed to remain secure, available and scalable.

Engineered for scale

  • Existing high-voltage
    Infrastructure

  • Development-ready
    Industrial campus

  • Phased expansion
    From 50 MW to 200 MW+

  • Dedicated cooling
    Water resources

  • Secure campus
    Architecture

  • Fibre connectivity
    To major hubs

  • Accelerated
    Deployment timelines

  • Positioned to support AI
    And hyperscale workloads

Protecting Our Environment and Community

NOVERIX is committed to protecting the environment, community safety and the quality of life of those living and working around our Mostar campus. These responsibilities will guide the project from design and construction through to daily operation.

Before construction begins, we will commission independent environmental and technical assessments to identify potential impacts and establish appropriate safeguards. Our design will address noise, air emissions, water consumption, drainage, and the safe handling of fuel, batteries and equipment, with particular attention to neighbouring communities and local water resources.

During operation, we will monitor environmental performance against applicable requirements and the commitments established through these assessments.

We will share clear information about our environmental performance and maintain a direct channel for residents to raise questions or concerns. As NOVERIX develops, we will reassess potential impacts so that safeguards keep pace with the campus’s growth.

Read more about our environmental commitments

Development

NOVERIX is advancing through the technical, regulatory and commercial stages required for large-scale data centre development.

The current programme includes detailed engineering, independent technical due diligence, permitting, power and connectivity planning, and preparation of the initial development phase.

The campus is structured for phased delivery, allowing construction and capacity deployment to follow tenant requirements and committed demand.

Our objective is to move from existing industrial infrastructure to an operational hyperscale platform through a clearly defined development process.

Education

Developing local talent for a digital future

NOVERIX’s vision extends beyond digital infrastructure. We aim to support young people in Mostar and across Bosnia and Herzegovina develop the knowledge and practical skills needed to participate in the growing AI economy.

As part of this ambition, we will establish an AI Academy, with proposed cooperation involving the University of Mostar, local schools and international technology partners. The initiative would connect education with practical applications of artificial intelligence and the technical disciplines supporting modern data centres.

Connecting education with opportunity

The proposed programme would focus on:

  • AI and digital literacy: Understanding how AI works, its practical applications, its limitations and its responsible use.
  • Technical skills: Introducing students to programming, data analysis, cloud computing, cybersecurity and data centre operations.
  • Practical learning: Developing opportunities for workshops, mentoring and industry projects that connect classroom learning with professional experience.
  • School engagement: Supporting specialised classes and introductory programmes that encourage younger students to explore science, engineering and technology.

Alongside opportunities for students, we intend to explore training pathways for professionals seeking to develop new skills or move into technical careers.

Building a future in Mostar

Our objective is to help local talent access internationally relevant knowledge while creating stronger reasons to study, work and build a future in Bosnia and Herzegovina. By connecting infrastructure investment with education, NOVERIX aims to support lasting opportunities for the surrounding community.

For details of education partnerships, programmes and participation opportunities, please contact education@noverix.com.

Send your inquiry